University of Chicago Utility Master Plan Stanley Consultants expands and updates the University of Chicago’s utility master plan for short and long-term needs. Learn More
Combining Heat, Cooling and Power into one Facility The University of Iowa’s Research Park is the fastest growing campus at the University. To support this continued growth, the University needed a robust utility infrastructure to support existing and future utility loads. Learn More
Retrofit, Switch or Shut Down – Complying with future Boiler MACT Regulations Stanley Consultants is on the front line helping manufacturing companies prepare for new Boiler MACT Regulations that will have a significant impact on their bottom lines. Our expert staff obtains the knowledge need to help you reduce that impact; keep your production online and your facility in compliance. Learn More
Energy Commissioning Gets LEED Gold Rating Stanley Consultants provided professional commissioning services for the construction and renovation of two facilities on the campus of Northern Arizona University. The services support the University’s requirements for LEED building certifications. Learn More
Chillin' in Downtown Lansing Designed by Stanley Consultants, the $20 million chilled water plant serves state and county buildings in downtown Lansing. Learn More
World’s Biggest Chiller Cools Qatar Island Stanley Consultants provided engineering design services for the world’s largest Integrated District Cooling plant, serving the needs of Qatar Island. The plant is also equipped with a desalination plant. Learn More
Embria Corporate Headquarters and Production Facility Stanley Consultants designed the multi-purpose facility to serve as a corporate headquarters, manufacturing plant, product warehouse, and packing gallery. Learn More
Harris Substation – Providing Reliable Power to 2030 Stanley Consultants provided construction administration, feasibility studies, concept and detailed design for the University of Texas/Austin Harris Substation upgrade. This substation is the hub for the university’s gas-fired 120MW Weaver Power Plant. Learn More
Tunnel Provides USU with Utility Distribution System Stanley Consultants provided comprehensive design services for a new 6,200-foot utility tunnel at the Utah State University. Using a compressed schedule this $22.2 million design-build project was completed in just over 18 months. Learn More
Connecting TECO’s Underground Utility Distribution Systems Stanley Consultants provided engineering services to connect the Central and South Main Plants. Learn More
Illinois State University South Campus Power Plant Stanley Consultants was hired as Designer of Record for a new state-of-the-art co-generation plant to meet the future cooling and heating needs of Illinois State University’s South Campus. Learn More
Electrical Services Updated Without a Glitch All While Class Was in Session In keeping with the Campus Master Plan, Illinois State University officials decided that the existing electrical service to campus buildings needed to be updated and turned to Stanley Consultants for the solution. Learn More

College Additions Designed to Meet LEED® Silver

Stanley Consultants provided civil, structural, mechanical, electrical, and construction administration services for three new science and technology additions at Clinton, Scott, and Muscatine Community Colleges.

Located at three different sites, the science instructional additions at each location were designed to include laboratory, lecture, office, laboratory preparation space; storage space and restroom facilities. The additions incorporate modern technologies, instructional methodologies and design layout. The project is designed to meet the requirements of LEED® Silver certification.

Not only are each of Eastern Iowa Community College's three campuses getting building additions for their science programs, each addition will be LEED® Silver certified.

 