Email

Related Projects Worldwide

Army Utility Modernization As one of the largest operators of central heating and cooling plants in the United States, the U.S. Army is committed to upgrading its thermal utilities to life cycle cost effective technology and efficiency. As part of the utility modernization effort, Stanley Consultants was hired to provide technical support for energy and utility systems engineering research. Learn More
Retro-Commissioning for a More Sustainable, Economical and Environmental U.S. Navy The U.S. Navy is committed to a more sustainable, economical and environmentally friendly future. In a continued effort to support their initiatives, the NAVFAC Atlantic Division contracted with Stanley Consultants to perform a retro-commissioning study in 58 of its buildings, covering approximately five million square feet. Learn More
Building Commissioning Helps Facility Maintain its Sustainability Stanley Consultants provided enhanced commissioning services for the National Guard’s Readiness Center in Iowa City, IA. The center, also designed by Stanley Consultants, meets the requirements set by the U.S. Green Building Council for the Leadership in Energy and Environmental Design (LEED) Silver Rating. Learn More
Privatizing Utilities for NAVFAC This comprehensive project began with the collection of field data including interviews with field activity personnel. Equipment was assessed and photographed, system deficiencies were documented and system inventory worksheets were populated. Replacement costs were estimated with a calculation of depreciated value and the sensitive data package was procured. Learn More
Rehabilitation Feasibility for Hydro Electric Generation Powerhouse The Center Hill Powerhouse in DeKalb County, Tennessee, had lost its efficiency because of age and normal wear and tear. This facility houses three hydroelectric generating turbines. Stanley Consultants prepared feasibility level cost estimates. Learn More
DOE Electrical Power System Upgrade Comprehensive Design The U.S. Department of Energy’s (DOE) Western Area Power Administration (WAPA) needed to upgrade, and in some cases replace, the electrical power system at the Lawrence Livermore National Laboratory in Livermore, California. The laboratory turned to Stanley Consultants to provide comprehensive engineering services for this complex project. Learn More
Reducing Greenhouse Gas Emissions In support of the Federal Executive Order 13514, the U.S. Department of Veterans Affairs Hospital in Dallas, TX awarded Stanley Consultants, in design-build partnership with contractor McCarthy Building Companies, the design and construction of a new combined heat and power (CHP) energy center. Learn More
VA Medical Center Boiler Plant Upgrades Stanley Consultants provided design and construction services for the replacement of three gas-fired water tube boilers and feedwater economizers, boiler feedwater treatment system, the condensate receiver system, and fuel oil pumping system for the U.S. Veteran Affairs (VA) Medical Center in Iowa City, IA. Learn More

Modernizing Fort Gordon’s Central Energy Plant

When the U.S. Army Corps of Engineers from Savannah, Georgia, needed assistance to modernize the Fort Gordon Central Energy Plant, they relied on Stanley Consultants for the modernization.

This project consisted of a complete field review of equipment condition, piping arrangements and performance history, the design firm provided demolition plans for the removal of existing equipment and supporting facilities, and then scheduled construction to allow the plant to remain in service throughout the duration of the project.

PROJECT FEATURES

Cooling Plant Modernization

  • Install firm chilled water generating capacity using four new 2,000-ton electric motor-driven chillers
  • Utilize two new 2-cell cooling towers with new constant speed condenser water circulation pumps
  • Reconnect existing chilled water storage tank and free cooling heat exchanger
  • Increase chilled water differential to 12 degrees F

Heating Plant Modernization

  • Install three forced-circulation water tube HTW generators with capacity of 50 MMBTU each
  • Employ primary-secondary hot water pumping scheme using three constant speed generator pumps and three variable speed distribution pumps

Electrical System Modernization

  • Install redundant 15 kV (500 kcmil, copper) feeders from substation to plant
  • Utilize 15 kV to 5 kV outdoor oil-filled unit-connected transformers connected to primary reactor type, reduced kVA starters for each chiller
  • Employ double-ended 480 V unit substation to feed load distributed Motor Control Centers
  • Install new 275 kVA standby, reciprocating engine generator

Control System Modernization

  • Implement hybrid Single Loop Controller (SLC) and Direct Digital Control (DDC) system
  • Extend the campus Energy Management and Control System (EMCS)

Fuel Oil Storage System Replacement

  • Replace eight underground 50,000-gallon fuel oil storage tanks
  • Determine number and size of new fuel oil storage tanks

Chilled Water Distribution System Modernization

  • Interconnect two Central Energy Plants to increase reliability and reduce operating cost
  • Convert direct primary, multi-zone radial feed system to primary-secondary-tertiary, single zone, looped system
  • Replace approximately 15 miles of chilled water distribution piping
  • Modify chilled water piping connections in nearly 140 buildings to decouple buildings from distribution system