Historic St. Anne's Senior Residential Home Saved from Demolition Stanley Consultant's design integrates floodwall onto a historic 1907 senior residential home. Learn More
Innovative Design Increases Orwell Dam Spillway Capacity Stanley Consultants’ design helps Orwell Dam safely release water with innovative tailwater control structure. Learn More
Developing a Hurricane and Storm Damage Risk Reduction System The two gates that comprise the “largest sector gates in the U.S.” are shipped to the construction site of the New Orleans’ West Closure Complex by barge. These gates were part of the U.S. Army Corps of Engineers (USACE) program to develop and design New Orleans’ $14.5 billion Hurricane and Storm Damage Risk Reduction System (HSDRRS). Stanley Consultants served on the program management team. Learn More
Hydroelectric Facilities Rehabilitated at Georgia’s Buford Dam Stanley Consultants prepared plans and specification for Buford Dam’s major rehabilitation. Learn More
Restoring New Orleans’ Hurricane Protection Hurricane Katrina decimated New Orleans’ hurricane protection system, leaving the city highly vulnerable to future hurricanes. The U.S. Army Corps of Engineers (USACE) selected Stanley Consultants to be the program manager for Task Force Guardian to restore the city’s hurricane protection system to pre-Katrina protection levels before the next hurricane season, just eight months away. Learn More
Grand Forks Flood Protection Project Proves to be Both Functional and Fun Many recreational amenities were designed into the new flood protection levee, including an outdoor venue for community events. Learn More

Evaluating Flood Risk Management Alternatives

Stanley Consultants provided engineering support to the U.S. Army COE after record level flooding inundated the City of Cedar Rapids.

In June 2008, the Cedar River crested to its highest level in Cedar Rapids, Iowa, history of over 31 feet surpassing the previous record of 20 feet.  Flood waters inundated 10 square miles, or 14 percent of the city, impacting 5,390 houses and dislocating over 18,000 residents.  More than 300 City facilities were damaged.

In July of 2008, Stanley Consultants was hired to coordinate with the Army Corps of Engineers development of flood management options for the City of Cedar Rapids.  The U.S. Army COE administers federal water resource programs for one of the world's largest inland waterway system and its tributaries, covering a 78,000 square-mile radius, serving five river basins in five states. 

The purpose of the feasibility study was to determine if a federal project to build permanent floodwalls could be recommended as economically feasible and environmentally acceptable.  The typical feasibility study process takes up to five years to complete.  Because of the intensive public participating planning process the City held in the months following the flood, the timeline was shortened to two years.

Stanley Consultants provided comprehensive engineering support for the overall USACE feasibility study including project coordination and engineering support. Project coordination included participation on the Corps' Product Delivery Team; support of USACE organized public meetings, documentation of meetings, and scheduling support.  Engineering support included the development and evaluation of various structural and non-structural alternatives to manage flood risk.  Major engineering responsibilities included preparation of 35 percent level design plans for the preferred plan and preparation of the Geotechnical, Structural Assessment, and Cost Estimate Appendices.

"Exceptional performance was accomplished in this effort. The Stanley team worked may hours to finish this rush job which was constrained by the availability of funding. The first door of funding was not received by CETAC until 28 November 2005 and the design was completed on 15 May 2006 allowing CETAC to award this highly important project on schedule".

ACASS Rating - Exceptional

Top